Re: Missouri River - Flood of Biblical Proportions 6/11/11
Posted by hanna on 6/12/2011, 10:04 am
On a good note here is a company that is working in the right direction.  This plant is still off line till repairs are completed.   The Crystal River Power plant: The Florida reactor was first taken offline in 2009 for refueling and a steam generator replacement. To accomplish the later, crews made a hole in a concrete outer wall at the plant. They subsequently noticed delamination of the concrete caused by loosening cables within the wall. Engineers have tried to fix the gap in the wall and retension about 200 cables, but work was stopped again when more delamination was discovered last month.



http://nuclearstreet.com/nuclear_power_industry_news/b/nuclear_power_news/archive/2011/04/06/crystal-river-reactor-offline-indefinitely-as-concrete-continues-to-bedevil-engineers030603.aspxhttp://www.wcjb.com/news/9667/crystal-river-power-plant-is-reviewed


http://www.tampabay.com/news/business/energy/crystal-river-nuclear-startup-again-delayed-as-costs-approach-500-million/1157496
118
In this thread:
A Looming Flood Disaster from the Mighty Mo? - JAC, 6/10/2011, 2:51 pm
< Return to the front page of the: message board | monthly archive this page is in
Post A Reply
This thread has been archived and can no longer receive replies.